Federal Office of Sport FOSPO (LED), Magglingen

Kilchenmann Kilchenmann, February 01, 2022

Federal Office of Sport FOSPO, Magglingen

Thanks to many years of collaboration, Kilchenmann was awarded the contract to replace the LED wall in the 5-court sports hall "Halle End der Welt".

The existing wall was only used to display the time. The new requirement was to be able to play images and videos. This is used to place advertisements or show presentations during training sessions in the hall. The most important use, however, is to display the results of competitions.

The challenge in installing the Unilumin 8x4.5 meter LED wall was the requirements of the listed building and the stability of the glass façade to which the LED wall was to be attached. After multiple checks of the support structure by the structural engineer, we were informed that the existing substructure could no longer be used. A new substructure therefore had to be developed, which no longer had to be attached to the glass façade. Maintenance can be carried out at any time using an existing lifting platform.

The control room technology was also renewed and expanded. With its AV over IP network, the fixed control room technology ensures a flawless display during the competitions. Mobile control room technology can be set up in the gallery. In addition, the hall's entire building services, such as blinds, lighting and AV technology, are now controlled via an AMX touch panel. In addition to the LED wall, we were also able to renew the entire sound system. We were also able to equip various rooms with AV technology. An 85" display and the sound system were installed in the gym. The seminar room was equipped with a projector lift, screen, loudspeakers and a hearing assistance system.

Federal Office of Sport FOSPO, Magglingen
Federal Office of Sport FOSPO, Magglingen